Maintenance Engineer

Position Sought Supervisory/ Management
Name Candidate ElecACNE1
Lives in Newcastle
Qualifications Mechanical Engineering Degree
C&G Electrical Installations
17th Edition
PAT Testing
IOSH
Legionella Awareness
MIET
Previous Employers Holiday Inn
TWP Packaging Ltd
Double Tree By Hilton
Etsi Siemens
Availability 2 week notice
General Notes if Applicable

 

Education:

  • BEng (Hons) Mechanical Engineering

Qualifications:

  • UK NARIC equivalent to BSME
  • UK Professional Membership
  • Institute of Engineering and Technology – MIET
  • IOSH Managing Safely
  • Certificate of Competence in Service inspection and Testing of Electrical Equipment (P AT Testing)
  • City & Guilds 17th Edition Wiring Regulation BS7671 2008; Level 3 
  • IHG Brand Standard Training Certificates
  • Controlling the Risk of Legionaires Disease
  • General Fire Training
  • Introduction to Information Security
  • Managing Health and Safety

Profile:

  • A Proactive Electro-Mechanical Engineer and Manager and a hands on professional with over 21 years of experience on multi engineering discipline in commercial and industrial environment. Back ground includes 11 years in Building services engineering and maintenance management, 5 years in agricultural and heavy equipment machineries MRO management and purchasing management, 3 years in ship repair & maintenance management, 1 year in manufacturing maintenance, and 1 year telecommunication installation and testing. Capable of delivering at the highest level. I have first-rate organisational skills and the ability to produce a consistently high standard of work. With excellent interpersonal skills, I am an effective team player and am capable of engaging and liaising with a broad range of individuals from a variety of backgrounds. My professional experience to date has provided a wealth of specialist skills and expertise and I am committed to facing fresh challenges and to pursuing my career goals

Key Skills:

  • Skills – Organised
  • Soft Skills – Professional, Motivated, Ethical
  • Behaviour Skills – Driven, Excellent Communicator
  • Awareness of modern maintenance techniques.
  • CAPEX, OPEX and SLA’s management
  • Corrective maintenance, Engineering Economy and root cause analysis
  • • A good understanding of BMS management system, HVAC design, maintenance & controls, Energy management and Boilers
  • Purchasing and Project management
  • Project estimates and bill of materials
  • MEP Design, installation and maintenance in shipping and building services environment
  • Farm machineries purchasing, repair and maintenance(MRO) management
  • Root cause analysis and utilisation of asset maintenance plan
  • Engineering Economy, Sheet metal fabrication, and stainless steel welding
  • Fault Finding and trouble shooting
  • Painting & decoration
  • Can read and interpret mechanical drawings, electrical and electronic diagrams, and LAN installations
  • Contract negotiation
  • Welding theory and practices (Arc and MIG), cutting acetylene, copper pipe soldering
  • Methodologically competent in using Multi function meter for electrical testing, PAT testing, Anemometers with pitot tube (HVAC), vane anemometers, and water test gauges
  • Experience in Ventilation system (AHU), submersible pumps and inverters
  • Superb leadership, coaching and mentoring skills
  • Experience in design using Solidworks , FEA analysis, Mathlab Simscape Modelling, & Gantt chart
  • Promoting a safety conscious working environment
  • Experience in maintenance budgets and controlling costs
  • Legionella management and risk assessment
  • Manage multi-site maintenance operation
  • Commissioning and testing (NDT) for electrical installation and PAT testing (Commercial & Domestic)
  • Knowledge of building codes, Health & safety laws and regulations

Key Achievement:

  • Utilising effectively HVAC system for Grade 1 & 2 listed buildings to be energy efficient (2017 – present)
  • Implementing effective and pro-active maintenance saving operational expenses for building services for Grade 1 & 2 listed buildings (2017 – present)
  • Improving auditorium ventilation and CO2 performance at 1249 capacity using my specialist skill in ventilation modelling (2017 – present)
  • My technical knowledge and experience to date in HVAC system, Boilers and BMS have proven in energy saving up to 20% to my previous and current company by properly managing and utilising PPM and energy saving scheme. (2008 – present)
  • Retrofitting old MEP services into efficient and functional system (2013 – present)
  • Resolved issues on FCU & AHU units by implementing corrective maintenance, improving its efficiency, implementing PPM, and reducing call outs on plumbers and electrician since I am a qualified plumber and electrician. (2008 – present)
  • Maintained high level of standard for preventive maintenance on rooms, public areas, mechanical, and electrical services which resulted in minimal down time on rooms, resulting in guest satisfaction, and minimal loss of revenues to the company. (2008 – present)
  • Save my previous company on OPEX for repair and maintenance when I was a Purchasing Manager and Consultant for repair & Maintenance by introducing improved purchasing procedures, sustainable asset maintenance plan and proactive preventive maintenance. Annual forecasted budget is P25 million per crop year and only utilised P15 Million. (2002 – 2007)
  • Introduce corrective maintenance and root cause analysis on farm equipment problems that resulted in minimal repair and maintenance, increase hydraulic efficiency on farm tractors, minimal downtime during field operations which significantly brought down repair and maintenance expenditures. (2002 – 2007)
  • Generated P2million projects per month and a P50 million projects for dry docking projects in passenger and cargo ships repair and maintenance. (1998 – 2001)
  • Involved in a P3.6 Billion telecom project for ETSI Siemens which kick off my career in engineering installation, reactive and preventive maintenance. (1997 – 1998)

Employment History:

XXXXXXXXXXXXXX Facility Maintenance Engineer

(United Kingdom)

April 2017 – Present

Theatre Royal Newcastle (Grade 1 listed Building) and City Hall (Grade 2 listed Building) Theatre Trust

Responsibilities:

  • Responsible for PPM, fault finding and reactive maintenance on the facilities for the Theatre and City Hall MEP services
  • Responsible for Health & Safety in my Department and part of Health & Safety Committee
  • Responsible for monitoring and controlling HVAC on auditorium, back of the house and front of the house via remote Siemens logic interface
  • Responsible for the management of maintenance, repair and overhaul of HVAC systems and MEP services
  • Responsible for surveying and estimates for repair and maintenance
  • Responsible for energy management through BMS control and utilising its full potential and efficiency and CO2 monitoring
  • Responsible for Asset Register list and plant life cycle and updates
  • Responsible for job costing estimates, time line, Gantt chart program planning for PPM, and projects across the site
  • Responsible for the management and supervision and workload of two Apprentices (Electrical and Joiner)
  • Responsible for SDR (Staff Development Review) in quarterly basis
  • Recommend alternative options using engineering economy for the CAPEX and new projects for the plant life asset cycle
  • Introduce corrective maintenance and preventive maintenance regime
  • Responsible for contractors SLA, schedules contract negotiation and risk assessment and method statement
  • Responsible for issuing permission to work and work permits for working at heights, confined spaces, electrical works, asbestos awareness and hot works permit
  • Responsible for the management of fire test, emergency lighting test and replacement, PAT test, 3 phase motors insulation resistance testing, fixed wiring test, and supervised electrical installation (small projects)
  • Attend Line Managers meetings and part of Health & Safety committee
  • Responsible for outsourcing for the materials to be used in repairs, and issuance of PO from Sage 200 system to suppliers
  • Conduct risk assessment and method statement
  • Responsible for PPM budget management and recommend proposal for life plant asset cycle

Holiday Inn-Newcastle Jesmond – Chief Engineer

4 Star Hotel

(United Kingdom)

March 2015 – April 2017

Owned by Cairn Group of Hotels

Responsibilities:

  • Responsible for PPM and reactive maintenance on 119 bedrooms, zio bar, restaurant, function rooms, kitchen, and newly refurbish fully function 16 bedroom suites apart Hotel
  • Maintaining the Planned Preventative Maintenance (PPM) and Statutory Compliance Programme for the property
  • Responsible for claiming contractor warranties, new asset warranties and to the achieve agreed SLA’s
  • Managing maintenance, repair and overhaul of AC units
  • Responsible for surveying and estimates for repair and maintenance
  • Responsible for Testing for Fixed electrical wiring (Insulation resistance, continuity test, Ze and Zs test), PAT testing and Full emergency light testing with issuance of certificate from IET for full testing of emergency lights. (non-destructive testing)
  • Responsible for collating completed PPM worksheets and reviewing for any additional works identified therein and planning additional resources to reflect availability in the company
  • Responsible for updating Asset Registers when equipment is replaced as part of Life Cycle or Small Works Programme for the Group
  • Conduct quality checked up on contractors installation on electrical and plumbing on small projects for the property
  • Environmental officer Green Engage previously doing Level 2 & 3
  • Manage CAPEX & OPEX budget, utilisation of 2 years sustainable asset maintenance plan
  • Responsible for job costing estimates, time line, Gantt chart program planning for PPM, and projects across the site
  • Assigned as senior manager to Maintenance Manager and directly report to General Man ager
  • Responsible for claiming contractor warranties and new asset warranties
  • Assigned to other sites own by Cairn Group to help on reactive and preventive maintenance and train Maintenance Managers on carrying corrective maintenance procedures for the Group
  • Install new electrical cables and rewiring (small projects) and conduct electrical periodic testing (Non destructive testing-NDT-Insulation resistance, earth loop impedance, continuity, and ground resistance) and PAT testing
  • Retrofitting old MEP services and troubleshooting HVAC faults
  • Manage a team of 3 personnel [Handyman, Painters (as per job assignment)]
  • Manage contract agreement and budget forecasting for PPM
  • Conduct PPM on HVAC, mechanical and electrical services. Canvass prices needed for the repairs and maintenance and issue PO to suppliers, contract tendering and review contractors performance
  • Minimise disruption to the hotel business and maintain the required availability of the key functional areas throughout the property
  • Maintain good working practices to enhance asset value and promote a positive image to the business
  • Responsible for PPM budget and proposal
  • Attend HOD meetings
  • Responsible for carrying out Fire and maintenance risk assessment and method statement
  • Responsible for issuance of work permits for contractors, implement health and issue policy, and making sure contractors comply on safety procedure to have lockout- tag out (LOTO) in place prior to the completion of maintenance or servicing work
  • BMS control and energy management
  • Review maintenance staff performance
  • Responsible for Legionaire diseases control, water temperature management and fire life safety

Sleeperz Hotel Maintenance Engineer

(United Kingdom)

June 2014 – Present

Responsibilities:

  • Supervised necessary maintenance and repair work carried on the hotel equipment. Conducted regular inspections on the electrical, HVAC and plumbing system and ensured their compliance with the UK building regulations and environmental regulations
  • CCTV installation and maintenance
  • Responsible for maintenance, repair and overhaul for HVAC system
  • Responsible for the management of PPM for MEP services, HVAC services and BMS
  • Responsible for surveying and estimates for repair and maintenance time line and Gantt chart program planning for PPM
  • Responsible for collating completed PPM worksheets and reviewing for any additional works
  • Identified therein and planning additional resources to reflect availability in the company
  • Minimise disruption to the hotel business and maintain the required availability of the key functional areas throughout the property
  • Responsible for full emergency lighting test and PAT testing (non destructive testing)
  • Maintaining the Planned Preventative Maintenance (PPM) and Statutory Compliance Programme for the property
  • Responsible for carrying out Fire and maintenance risk assessment and method statement
  • Conduct reactive and preventive maintenance on MEP services
  • Conduct electrical rewiring and plumbing installation
  • Responsible for claiming contractor warranties, new asset warranties and to the achieve agreed SLA’s
  • Trouble shoot HVAC faults
  • Implement energy management scheme on BMS and utilisation of asset maintenance plan
  • Ensuring that all certificates of compliance are maintained and up to date in accordance with relevant legislation
  • Responsible for legionnaire water testing, emergency test, and fire test
  • Responsible for the purchasing of materials
  • Responsible for reactive maintenance of hotel services for 98 bed rooms Responsible for reactive and preventive maintenance on hotel services

Double Tree by HILTON – 4 Star Hotel Maintenance Manager

(United Kingdom)

March 2014 – October 2014

Owned by Cairn Group of Hotels

Responsibilities:

  • Managing maintenance schedules and budgets
  • Delivering planned and property maintenance for 177 bedrooms, restaurant, bar, 2 function kitchen, and 1 function suites
  • Manage a team of 3 personnel (electrician and painters)
  • Manage contract agreement and budget forecasting for PPM
  • Responsible for purchasing of materials and bill of materials for in house projects and issue PO to suppliers
  • Responsible for risk assessment and method statement
  • Responsible for Maintenance, repair & overhaul for HVAC systems
  • Responsible for surveying and estimates for repair and maintenance
  • Responsible for carrying out Fire and maintenance risk assessment
  • Responsible for Hilton brand standard for health & safety, and PPM schedules Ensuring that all certificates of compliance are maintained and up to date in accordance with relevant legislation
  • Responsible for AHU (heat recovery –cross flow), Daiken VRF water cooled type condensers & FCU PPM
  • Conduct reactive and preventive maintenance on MEP services
  • Updating Asset Registers when equipment is replaced as part of Life cycle or small works programmed for the property
  • Responsible for claiming contractor warranties, new asset warranties and to the achieve agreed SLA’s
  • Attend HOD meetings
  • Assigned to other sites own by Cairn Group to help on reactive maintenance and trouble shootings
  • Responsible for issuance of work permits for contractors, implement health and issue policy, and making sure contractors comply on safety procedure to have lockout- tag out (LOTO) in place prior to the completion of maintenance or servicing work
  • Responsible for legionnaire water testing, emergency test, and fire test. Delegating work responsibilities and conduct fire risk assessment
  • Prepared budget for the project and calculated the project estimate
  • Canvass prices needed for the repairs and maintenance and issue Po to suppliers, contract tendering and review contractors performance
  • Monitored all the Life Safety programs and their associated procedures such as the quality control for the water used in the facility
  • Responding quickly to any emergencies
  • Conducting employee performance reviews
  • Participating in senior management meetings
  • Implement energy management scheme on BMS and utilisation of asset maintenance plan

TWP Packaging Ltd. Maintenance Engineer

(United Kingdom)

February 2014 – March 2014

Responsibilities:

  • Responsible for the electrical and mechanical (PPM) preventive maintenance on the main production line that is STORTI pallet making machine and the 60 tone boiler that produce hot steam for the kilns
  • Responsible for the jig up of the machines, welding using MIG welding new frames for the machines

Holiday Inn – Newcastle Jesmond – Maintenance Manager

4 Star Hotel

(United Kingdom)

March 2012 – February 2014

Owned by Cairn Group of Hotels

Responsibilities:

  • Responsible for reactive & PPM of 119 bedrooms, restaurant, bar, 2 function kitchen and 3 function suites
  • Implement energy management scheme on BMS and utilisation of asset maintenance plan
  • Conduct fire risk assessment
  • Responsible for job costing and estimates and project planning
  • Responsible for Maintenance, repair & overhaul for HVAC systems
  • Manage a team of 4 personnel (Joiner, painters, and plumber)
  • Manage contract agreement and budget forecasting for PPM
  • Responsible for legionnaire water testing, emergency test, and fire test
  • Responsible for carrying out Fire and Maintenance risk assessment
  • Supervised necessary maintenance and repair work carried on the hotel equipment.
  • Provided training to maintenance staff, hired staff in case of inadequacies and assisted in the development of the staff
  • Responsible for reactive and preventive maintenance for MEP services
  • Conducted regular inspections on the electrical, HVAC and plumbing system and ensured their compliance with the building regulations and environmental regulations
  • Prepared budget for the project and calculated the project estimate
  • Monitored all the Life Safety programs and their associated procedures such as the quality control for the water used in the facility
  • Coordinated with the outside vendors and drafted a contract for the necessary maintenance work that was carried in the facility
  • Responsible for PPM budget and proposal
  • Ensured that all work done was in accordance to the applicable codes and company standards
  • Maintained all the lock systems that were in the facility
  • Responsible for purchasing of materials and bill of materials for in house projects and issue PO to suppliers
  • Responsible for claiming contractor warranties, new asset warranties and to the achieve agreed SLA’s
  • Conduct review on maintenance staff performance
  • Responsible for issuance of work permits for contractors, implement health and issue policy, and making sure contractors comply on safety procedure to have lockout- tag out (LOTO) in place prior to the completion of maintenance or servicing work
  • Conduct repair & installation for plumbing and electrical rewiring
  • Responsible for IHG brand standard for health & safety, MQSA and PPM schedules
  • Attend HOD meetings
  • Responsible for legionnaire water testing

Staybridge Suite Newcastle – Maintenance Assistant

4.5 Star Hotel

(United Kingdom)

May 2009 – March 2012

Responsibilities:

  • Conduct repairs on plumbing, in rooms’ appliances, electrical trouble shooting, PPM of FCU & AHU, painting & decoration for 124 bed room suites
  • Assist Maintenance Manager on Pre opening of this Hotel
  • Responsible for safe keeping of operating manuals of the site and identifying MEP services location as per drawings design
  • Conducted regular inspections on the electrical, HVAC and plumbing system and ensured their compliance with the building regulations and environmental regulations
  • Responsible Mitsubishi VRF & FCU PPM
  • Conduct plumbing, painting and electrical repairs
  • Responsible for legionnaire water testing, MQSA and fire test
  • Responsible for IHG brand standard for health & safety, and PPM schedules

Caledonian Hotel, Jesmond – Maintenance / Handyman

3 Star Hotel

(United Kingdom)

February 2008 – May 2009

Responsibilities:

  • Conduct repairs & installation on plumbing, electrical trouble shooting and rewiring, painting & decoration for 98 bedrooms, restaurant, bar, and function suites Conducted regular inspections on the electrical, and plumbing system and ensured their compliance with the building regulations and environmental regulations Responsible for purchasing of materials and bill of materials for in house projects and issue PO to suppliers

Agro Terre, Inc. Purchasing Manager / 

Consultant for Repair & Maintenance

(Bacolod City)

July 2002 – July 2007

Responsibilities:

  • Responsible for developing and modelling a Purchasing system from scratch. Modelled for farm machineries repair and maintenance and operations. Developing a system that can tracked purchasing histories on R&M, equipment expenses and forecasting budget for annual repair and maintenance
  • Responsible for managing maintenance, repair and overhaul (MRO) for diesel engines and farm implements like Massey Ferguson tractors, Ford tractors, John Deere, and 32 units personal cars of Managing Directors
  • Responsible for Order Placement Timing, Supply / Demand Alignment, Material Replenishment and Supplier Performance
  • Continuously monitoring, evaluating and improving supplier performance
  • Sourcing the most affordable materials for the company’s agricultural operation Projecting stock levels
  • Forecast CAPEX and OPEX and utilisation of 3 years sustainable asset maintenance plan for Farm tractors and equipment’s that are Ford, Massey Fergusson, Caterpillar, John Deer, IH, and Isuzu and Fuso trucks
  • Reviewing tenders and bids
  • Manage a team of 6 highly skilled automotive technician, and a team of 32 drivers during operation
  • Controlling the purchasing budget and responsible for job costing and estimates on repairs and maintenance budget
  • Monitoring delivery times to ensure they are on time
  • Ensuring the adequate supply of all required materials, components and equipment
  • Delivering cost savings for the company
  • Managing the procurement supplier relationships for the company
  • Helping to source alternative items for buyers and customers
  • Responsible for carrying out risk assessment in our shop
  • Developing sourcing strategies
  • Managing commodity cost initiatives
  • Preparing high quality tender documentation
  • Regularly contacting suppliers to renegotiate prices
  • Resolving disputes and claims with vendors and suppliers
  • Keeping all supplier programs current and accurate
  • Promoting best practise across the company
  • Involved in writing up contracts and the terms of sales
  • Developing relationships with distributors
  • Involved in selling off excess, damaged and inventory and stock
  • Train drivers/operators for preventive maintenance
  • Attend senior management meetings
  • Recommend PPM schedules as to minimise down time during field operations. Apply root-cause analysis on early hydraulic and pneumatic failure, early engine breakdown and recommend corrective maintenance to increase operational efficiency

Cosmos Bottling Company Welder Engineer / Mechanical Fitter

(Bacolod City)

August 2001 – July 2002

Owned by Coca Cola Company

Responsibilities:

  • Conduct preventive & reactive maintenance on gear boxes, compressors, boilers for water bottle machine, conveyors, pumps, pneumatics, hydraulics, and case packers and minimised down time for the bottling equipment’s. Involved in fabrication and new fittings for in house projects

Wescon Machine Works, Vessel Technical Supervisor / 

Subsidiary of NENACO Project Manager

(Bacolod City)

November 1998 – August 2001

Responsibilities:

  • Plan and implement projects for Dry docking and lay over and special project
  • Responsible for surveying and costing and estimates for projects on repair and maintenance on vessel during dry docking and lay over and liaising this with vessel Captain, Vessel Superintendent and Chef Engineer
  • Help define project scope, goals and deliverables
  • Define tasks and required resources
  • Monitoring progress of the project for dry docking repairs
  • Collect and manage project team
  • Manage budget
  • Allocate project resources
  • Responsible for the creation of schedules and project timeline (Gantt Chart)
  • Responsible for tracking deliverables from suppliers
  • Supervised container fabrication and repair and liaise with container auditor for the approval of finished product
  • Responsible for managing maintenance, repair and overhaul (MRO) for winged motor and hydraulic system for gang planks
  • Lead quality assurance for welding works for container van fabrication and pipe work
  • Design HVAC and MEP services for passenger accommodation
  • Design, supervise installation for gang plank and wrenches for cargo, container, and passengerships
  • Supervised and managed dry docking projects for hot works such as hull and deck replating and renewing of pipes for fresh and salt water, fire sprinkler system at the car deck, and tank cleaning for the ballast, fresh water supply and salt water supply, new electrical installation and refurbishment of passenger accommodations. Coordinate with ABS (American Bureau of Shipping) for the final inspection of welding works (non destructive testing) for the hull replating or any major welding jobs on the ships
  • Responsible for the quality and satisfaction of the outcome of the project for Dry docking and layover
  • Support and direct team of 10 highly skilled welders, plumbers, electrician, painters, joiners, and decorators in every dry-docking, onboard and lay over jobs to accomplished target date for the project
  • Monitor and report on project progress
  • Present to stakeholders reports on progress as well as problems and solutions
  • Implement and manage change when necessary to meet project outputs
  • Evaluate and assess result of project
  • Reporting and documentation on the course of the project
  • Responsible for bill of materials (BOM)
  • Design & implement new plumbing system for drinking water for passenger accommodation
  • Organised sub contractors working on the project
  • Responsible for the resources availability and allocation
  • Conduct risk assessment
  • Use appropriate verification techniques to manage in project scope, schedule and cost
  • Responsible for providing the management of projects and agreeing project objectives
  • Carrying out quality standard check up making sure that all aims of the project are met
  • Monitoring sub contractors to ensure guidelines are maintained
  • Monitoring the accounting, costing and billing making sure the project is on budget and delivered on time
  • Updating Gantt chart and utilising IT services and monitoring to keep tract of subcontractor personnel progress and maintaining comprehensive project documentation

Etsi-Siemens Cable Tester / Testing & 

Commissioning

(Bacolod City)

June 1997 – November 1998

Responsibilities:

  • Conduct testing on copper cables up to 1000 pairs, running test calls, continuity test, ground test, splicing for copper and fibre optic cables
  • Conduct non destructive testing on new copper cables (Insulation resistance testing, Continuity, Ground resistance readings and oscilloscope)

Additional Information:

International Qualification:

  • Registered Mechanical Engineer (RME)
  • Philippine Society of Mechanical Engineer
  • Bachelor of Science in Mechanical Engineering (BSME)
  • Bachelor of Science in Industrial Management (Minor subjects taken only then shifted to BSME)

Personal:

  • Can work well with others in order to accomplished company’s goal Always leading by example to met company’s expectation
  • Ability to influence and negotiate within a customer focused environment

Engineering Projects:

  • Personal Project – Renovation of 3 bedroom house at 114 Brighton road, Gateshead- Installed plumbing for hot and cold water supply and heating, and rewiring for new lights and fixtures – 2014
  • Personal Project – Design in solid works one product and conduct FEA analysis for a project in Northumbria University – 2014
  • Personal project – Renovation of 3 bedroom house at 37 Market lane Gateshead—Installed plumbing for hot and cold water supply and heating, and rewiring of new lights and fixtures – 2013
  • Oversee & manage replacement of 3 Calorific tank in Holiday Inn Newcastle Jesmond, UK – 2013
  • Oversee and manage refurbishment of 12 bedrooms in Caledonian Hotel in Jesmond, UK – 2009
  • Personal Project- Fabrication of stainless steel railings and painting of two storey commercial building in Victorias City, Neg. Occidental Philippines – 2002
  • Project Manager for MEP Services for 3 storey building in Kabankalan Neg. Occidental Philippines. 2002
  • Project manager for a P50 million M/V Sta. Ana, M/V San Paulo, M/V Sta. Maria, M/V St. Joseph dry docking repair, installation and maintenance for hot works( hull replating, deck replating-port side and starboard side, new MEP services for passenger accomodation) electrical installation, tank cleaning for ballast tank, salt and fresh water supply, painting and decoration, and joinery jobs for passenger accommodation and deck department –Tsunieshi Cebushipyard Philippines 1998 – 2001

Driving License

  • Clean Full UK Driving license
Looking to recruit?

Find out how we can help you fill your current HVAC or FM role

Partner with us today
Looking for your next job?

If you are looking for a new job we are here to help

Start your search here